AS/NZS 4911:2003

$129.36

General conditions of contract for the supply of equipment without installationAustralian/New Zealand Standards / 01-Jan-2003

Sets out general conditions of contract for the supply of equipment which is purpose-built or manufactured, including equipment such as building elements. Where equipment is being supplied for use at different times or stages, separable portions may be appropriate. If installation is required, AS 4910-2002 for supply of equipment with installation, should be used.




Add to Cart:

  • Model: JDFNRV7Y
  • 8888 Units in Stock


This product was added to our catalog on Thursday 01 January, 1970.

Your IP Address is: 54.162.133.222
Copyright © 2018 Buy Standards.